Sign In  |  Register  |  About Menlo Park  |  Contact Us

Menlo Park, CA
September 01, 2020 1:28pm
7-Day Forecast | Traffic
  • Search Hotels in Menlo Park

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Introduction of SGW101 Polymer Cement Waterproof Coating

The SGW101 Polymer Cement Waterproof Coating is a two-component water-based waterproof coating made, using a scientific formula, from an organic liquid mixture of high-quality modified acrylic copolymer emulsion and multiple imported additives and an inorganic powder mixture of composite portland cement and various additives.

Packaging Specification

Executive Standard

The product complies with the requirements of GB/T23445-2009 Polymer-modified Cement Compounds for Waterproofing Membrane. 

Scope of Application

The product is suitable for use in the waterproof works of toilets, bathrooms, kitchens, balconies, floors and floor heating and other interior parts of buildings. It can also be used in one of the multiple waterproof courses of non-exposed roofs.

Balcony

Bathroom

Kitchen

Product Characteristics

  • Green, safe and environment friendly
  • Applicable to wet and damp substrates and firm bonding
  • Roller or brush coating
  • Air permeable but waterproof
  • High film strength and big extension

Method of Application

When the coating film of the waterproof layer is 1.0 mm thick, the usage is about 1.7 ~ 1.9 kg/m2. (Actual usage depends on the substrate condition and coating thickness.)

The coating film thickness of the waterproof layer shall not be less than 1.5mm, and the thickness of the vertical plane shall not be less than 1.2mm.

The product mix ratio is liquid: powder = 1:1.2 (mass ratio).

Substrate treatment → additional waterproof layer in details → coating for large-area waterproof layer → quality inspection and acceptance → application of protective and isolation layers

  • The normal application temperature is 5 ℃ ~ 35 ℃. Application is not allowed in rainy weather.
  • Substrate treatment: The substrate should be flat, solid, clean, and free of visible water, ash and oil stains. Internal and external corners and tube roots should be subject to arc treatment.
  • Coating ratio: Refer to the product certificate for the mixture ratio. First, add the liquid material into a mixing bucket. Then, slowly add the powder material in the process of mechanical mixing, and mix evenly. The prepared coating should be used up within 2 hours. It is forbidden to add water again in the use process.
  • Additional waterproof layer in details: An additional layer should be made for internal and external corners, pipe roots, drainage outlets and other detail nodes, which are to be coated 2-3 times, and matrix reinforcement material shall be sandwiched to make the waterproof coating fully permeate the matrix layer, without wrinkle and edge warping.
  • Coating for large-area waterproof layer: For large waterproof layers, it is proper to coat the facade first and then the planes, with 2-3 courses of coating applied. However, the next course can only start after the previous coating is dry, and the direction of coating should be vertical to that of the preceding coating.
  • Application of protective and isolation layers: In a humid environment, the drying of the product will become slow, and the drying time should be appropriately extended. After the waterproof layer is completely dried, the closed water test should be carried out. After acceptance inspection, the protective and isolation layers should be applied according to the design requirements.


Transportation & Storage

  • This product is a non-flammable and non-explosive material and can be transported as general goods. During transportation, it is necessary to prevent rain, sun exposure, freezing, extrusion and collision, and keep the package intact.
  • Store the product in a cool and dry place at 5 ℃ to 35 ℃, and avoid sun exposure, freezing, extrusion and collision.
  • Under normal transportation and storage conditions, the product lasts for 12 months.


Points for Attention

  • After the coating is mixed according to the specified ratio, please use it up within 2 hours. It is forbidden to add water again during use.
  • It will take 2~3 days for the coating film to dry completely, and the drying time should be appropriately prolonged in a humid environment.
  • After the coating film is completely dry, closed water test can be carried out. After acceptance inspection, the protective and isolation layers shall be applied according to the design requirements.


Quality, Safety & Environmental Protection

Media Contact
Company Name: 3TREES
Contact Person: Media Relations
Email: Send Email
Phone: +86 0594 2761989
Address:Headquarter: 518 Liyuan North Avenue, Licheng District
City: Putian
State: Fujian, 351100
Country: China
Website: https://www.3treesgroup.com/


Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 MenloPark.com & California Media Partners, LLC. All rights reserved.