Sign In  |  Register  |  About Menlo Park  |  Contact Us

Menlo Park, CA
September 01, 2020 1:28pm
7-Day Forecast | Traffic
  • Search Hotels in Menlo Park

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Elixir Energy brings Nomgon-10 pilot well into production

Elixir Energy Ltd (ASX:EXR) MD Neil Young tells Proactive the company’s Nomgon-10 pilot well is now online at its Nomgon IX coal bed methane (CBM) project in the South Gobi Basin of Mongolia. Elixir is bringing the well into production slowly to minimise the risks of formation damage and shocks to the coal reservoir. Meanwhile in the Yangir region, a successful drill stem test (DST) was performed on the Yangir West-2 well, with the results constituting a CBM gas discovery with the company having proved the presence of gas-saturated coal with adequate permeability.

Young said, “The drilling of the Nomgon-10 pilot well has gone to plan and we look forward to growing production of water – and then gas – from this well.

"Favourable results will put the Nomgon Pilot Project back on the intended pathway of determining commercialism."

Contact Details

Proactive Investors

Jonathan Jackson

+61 413 713 744

jonathan@proactiveinvestors.com

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 MenloPark.com & California Media Partners, LLC. All rights reserved.