Baker Hughes zero-emissions electric-powered compressor technology proposed for cleaner energy delivery
Tellurian Inc. (Tellurian) (NYSE American: TELL) announced that the U.S. Federal Energy Regulatory Commission (FERC) issued the certificate on April 21, 2023 granting authorization for Driftwood Pipeline, LLC’s Line 200 and Line 300, an approximate $1.4 billion natural gas transmission project proposed to be located in Beauregard and Calcasieu Parishes, Louisiana. The pipelines will have the ability to supply up to five and one-half billion cubic feet of natural gas daily with virtually no emissions due to the implementation of electric-powered Integrated Compressor Line (ICL) technology from Baker Hughes.
Tellurian President and CEO Octávio Simões said, “Tellurian thanks the FERC for their thorough and collaborative review of our Driftwood Pipeline Project and we look forward to delivering natural gas in a cleaner and highly reliable way to Southwest Louisiana.”
About Tellurian Inc.
Tellurian intends to create value for shareholders by building a low-cost, global natural gas business, profitably delivering natural gas to customers worldwide. Tellurian is developing a portfolio of natural gas production, LNG marketing and trading, and infrastructure that includes an ~ 27.6 mtpa LNG export facility and an associated pipeline. Tellurian is based in Houston, Texas, and its common stock is listed on the NYSE American under the symbol “TELL”.
For more information, please visit www.tellurianinc.com. Follow us on Twitter at twitter.com/TellurianLNG
CAUTIONARY INFORMATION ABOUT FORWARD-LOOKING STATEMENTS
This press release contains forward-looking statements within the meaning of U.S. federal securities laws. The words “anticipate,” “assume,” “believe,” “budget,” “estimate,” “expect,” “forecast,” “initial,” “intend,” “may,” “plan,” “potential,” “project,” “proposed,” “should,” “will,” “would,” and similar expressions are intended to identify forward- looking statements. Forward-looking statements herein relate to, among other things, the capacity, cost, emissions and other aspects of the transmission project. These statements involve a number of known and unknown risks, which may cause actual results to differ materially from expectations expressed or implied in the forward-looking statements. These risks include the matters discussed in Item 1A of Part I of the Annual Report on Form 10-K of Tellurian for the fiscal year ended December 31, 2022, filed by Tellurian with the Securities and Exchange Commission (the SEC) on February 22, 2023, and other Tellurian filings with the SEC, all of which are incorporated by reference herein. The forward-looking statements in this press release speak as of the date of this release. Although Tellurian may from time to time voluntarily update its prior forward-looking statements, it disclaims any commitment to do so except as required by securities laws.
View source version on businesswire.com: https://www.businesswire.com/news/home/20230424005600/en/
Contacts
Media:
Joi Lecznar
EVP Public and Government Affairs
Phone +1.832.962.4044
joi.lecznar@tellurianinc.com
Investors:
Matt Phillips
Vice President, Investor Relations
Phone +1.832.320.9331
matthew.phillips@tellurianinc.com